Vale – Brucutu

São Gonçalo do Rio Abaixo - MG

About Project
Providing design, manufacturing and transport 8,000 tons of steel structures and assembly of 2,200 tons, Installation of 19,000 m2 Coverage tiles and locks Lat buildings of workshops and wagons loading.

Built Area
19.000 m²

Weight
8.000 T

 

Posted in: